Energy & connection
Data center power connection.
Energy is the number-one success factor for a data center. Digital2060 secures the energy strategy and high-voltage power connection of your projects.
We anticipate capacity, supply and energy-transition challenges, working with grid operators.
Contact us
Capacity & supply
Sizing needs and securing the required electrical power.
HV connection
Coordinating connection studies and processes with grid operators.
Energy transition
Low-carbon energy and waste-heat recovery.
FAQ
Frequently asked questions
What are the key steps of a data center power connection?
Power-need assessment, connection study with the grid operator, choice of HV delivery point, then works and commissioning.
How much does a data center consume?
It depends on IT power; today's projects reach tens or hundreds of MW. Efficiency (PUE) and low-carbon sourcing are decisive.
Can the heat be reused?
Yes, waste heat can supply a district heating network, greenhouses or public buildings — a benefit for the territory.